12.22.20 – APFA MIA Base Brief – GIG Position 9 Update
Tuesday, December 22, 2020
GIG Position 9 Update
All,
Starting on January 4th, GIG will operate as a 777-200. The 787 was originally planned to operate the trip for January, but due to delivery delays, it was changed to a 777-200 for the remainder of the month. Position 9 was left open due to the equipment substitution and was not loaded in PBS. Tonight’s TTS run will include Position 9 for GIG.
For the carry-over sequences starting on January 28th, Position 9 will be loaded in TTS on January 10th. I have also brought to the Company’s attention that Flight 905 MIA-GIG on January 3rd operates as a 787 and returns on the 777-200. They will need to build a sequence with a deadhead leg out of Miami, to work the return leg.
I want to wish everyone a Merry Christmas and healthy happy holiday season.
In Solidarity,
Randy Trautman
APFA MIA Base President
[email protected]
Heidi Morgan
APFA MIA Full-Time Base Council Representative
[email protected]